PROJECT PLAN TEMPLATE
< INSERT ISSUING
ORGANIZATION >
< INSERT PROJECT
NAME >
Document Revision #:
Date of Issue:
Project Manager:
Approval Signatures
Approved by: Business Project Leader
|
|
Approved by: IM/IT Project Leader
|
|
|
|
|
|
|
|
|
|
Prepared by: Business Project Manager
|
|
Prepared by: IM/IT Project Manager
|
|
|
|
|
|
|
|
|
|
|
|
Reviewed by: Quality Assurance Manager
|
|
|
|
1. Project Overview..................................................................................................... 1
1.1 Purpose,
Scope, and Objectives.............................................................................. 1
1.2 Assumptions
and Constraints.................................................................................. 1
1.3 Project
Deliverables................................................................................................ 2
1.4 Schedule
and Budget Summary............................................................................... 2
1.5 Evolution
of the Plan............................................................................................... 2
1.6 References............................................................................................................. 2
1.7 Definitions
and Acronyms........................................................................................ 3
2. Project Organization.............................................................................................. 4
2.1 External
Interfaces................................................................................................... 4
2.2 Internal
Structure..................................................................................................... 4
2.3 Roles
and Responsibilities....................................................................................... 4
3. Managerial Process Plans.................................................................................... 5
3.1 Start‑up
Plan........................................................................................................... 5
3.1.1 Estimates............................................................................................................................................ 5
3.1.2 Staffing................................................................................................................................................ 5
3.1.3 Resource
Acquisition........................................................................................................................ 5
3.1.4 Project
Staff Training........................................................................................................................ 6
3.2 Work
Plan............................................................................................................... 6
3.2.1 Work
Breakdown Structure.............................................................................................................. 6
3.2.2 Schedule
Allocation.......................................................................................................................... 7
3.2.3 Resource
Allocation.......................................................................................................................... 7
3.2.4 Budget
Allocation.............................................................................................................................. 7
3.3 Project
Tracking Plan............................................................................................... 8
3.3.1 Requirements
Management........................................................................................................... 8
3.3.2 Schedule
Control.............................................................................................................................. 8
3.3.3 Budget
Control................................................................................................................................... 8
3.3.4 Quality
Control................................................................................................................................... 9
3.3.5 Reporting............................................................................................................................................ 9
3.3.6 Project
Metrics................................................................................................................................... 9
3.4 Risk
Management Plan............................................................................................ 9
3.5 Project
Closeout Plan............................................................................................ 10
4. Technical Process Plans.................................................................................... 11
4.1 Process
Model...................................................................................................... 11
4.2 Methods,
Tools, and Techniques............................................................................ 11
4.3 Infrastructure......................................................................................................... 11
4.4 Product
Acceptance.............................................................................................. 12
5. Supporting Process Plans................................................................................. 13
5.1 Configuration
Management.................................................................................... 13
5.2 Verification
and Validation..................................................................................... 13
5.3 Documentation...................................................................................................... 14
5.4 Quality
Assurance.................................................................................................. 14
5.5 Reviews
and Audits............................................................................................... 14
5.6 Problem
Resolution............................................................................................... 15
5.7 Subcontractor
Management................................................................................... 15
5.8 Process
Improvement............................................................................................ 15
6. Additional Plans.................................................................................................... 16
Annex A........................................................................................................................... 18
Annex B.......................................................................................................................... 19
Document Change Control
This section
provides control for the development and distribution of revisions to the
Project Charter up to the point of approval. The Project Charter does not
change throughout the project life cycle, but rather is developed at the
beginning of the project (immediately following project initiation approval,
and in the earliest stages of project planning). The Project Charter provides
an ongoing reference for all project stakeholders. The table below includes the
revision number (defined within your Documentation Plan Outline), the date of
update/issue, the author responsible for the changes, and a brief description
of the context and/or scope of the changes in that revision.
Revision Number
|
Date of Issue
|
Author(s)
|
Brief Description of
Change
|
|
|
|
|
1.
Project Overview
This
section of the IM/IT Project Management Plan provides an overview of the
purpose, scope and objectives of the project for which the Plan has been
written, the project assumptions and constraints, a list of project
deliverables, a summary of the project schedule and budget, and the plan for
evolving the IM/IT Project Management Plan.
1.1 Purpose, Scope, and Objectives
·
Define the purpose and scope of
the project.
·
Describe any considerations of
scope or objectives to be excluded from the project or the deliverables.
·
Ensure that the statement of
scope is consistent with similar statements in the business case, the project
charter and any other relevant system‑level or business‑level documents.
·
Identify and describe the
business or system needs to be satisfied by the project.
·
Provide a concise summary of:
−
the project objectives,
−
the deliverables required to
satisfy the project objectives, and
−
the methods by which
satisfaction of the objectives will be determined.
·
Describe the relationship of
this project to other projects.
·
If appropriate, describe how
this project will be integrated with other projects or ongoing work processes.
·
Provide a reference to the
official statement of project requirements (e.g.: in the business case or the
project charter).
1.2 Assumptions, Constraints and Risks
·
Describe the assumptions on
which the project is based.
·
Describe the imposed
constraints and risks on the project such as:
−
schedule,
−
budget,
−
resources,
−
quality,
−
software to be reused,
−
existing software to be
incorporated,
−
technology to be used, and
−
external interfaces.
1.3 Project Deliverables
·
Identify and list the
following, as required to satisfy the terms of the project charter or contract:
−
project deliverables (either
directly in this Plan, or by reference to an external document),
−
delivery dates,
−
delivery location, ands
−
quantities required.
·
Specify the delivery media.
·
Specify any special
instructions for packaging and handling.
1.4 Schedule and Budget Summary
·
Provide a summary of the
schedule and budget for the IM/IT project.
·
Restrict the level of detail to
an itemization of the major work activities and supporting processes (e.g.:
give only the top level of the work breakdown structure).
1.5 Evolution of the Plan
·
Identify the compliance of this
Plan to any standards.
The
structure of this Project Plan is in compliance with the recommendations of
IEEE Std 1058‑1998.
·
Specify the plans for producing
both scheduled and unscheduled updates to this Plan.
·
Specify how the updates to this
Plan shall be disseminated.
·
Specify how the initial version
of this Plan shall be placed under configuration management.
·
Specify how changes to this
Plan shall be controlled after its issue.
1.6 References
·
Provide
a complete list of all documents and other sources of information referenced in
this Plan.
·
Identify
each referenced document by title, report number, date, author and publishing
organization.
·
Identify
other referenced sources of information, such as electronic files, using unique
identifiers such as path/name, date and version number.
·
Identify
and justify any deviations from the referenced standards or policies.
1.7 Definitions and Acronyms
·
Define,
or provide references to documents or annexes containing the definition of all
terms and acronyms required to properly understand this Plan.
2.
Project Organization
2.1 External Interfaces
·
Describe
the organizational boundaries between the project and external entities.
·
Identify,
as applicable:
−
the
parent organization,
−
the
customer,
−
subcontracted
organizations, and
−
other
organizational entities that interact with the project.
·
Use
organizational charts or diagrams to depict the project's external interfaces.
2.2 Internal Structure
·
Describe
the internal structure of the project organization.
·
Describe
the interfaces among the units of the IM/IT development team.
·
Describe
the interfaces between the project and organizational entities that provide
supporting processes, such as configuration management, quality assurance, and
verification and validation.
·
Use
organizational charts or diagrams to depict the lines of authority, responsibility
and communication within the project.
2.3 Roles and Responsibilities
·
Identify
and state the nature of each major work activity and supporting process.
·
Identify
the organizational units that are responsible for those processes and
activities.
·
Consider
using a matrix of work activities and supporting processes vs. organizational
units to depict project roles and responsibilities.
3.
Managerial Process Plans
This
section of the IM/IT Project Management Plan specifies the project management
processes for the project. This section defines the plans for project start‑up,
risk management, project work, project tracking and project close‑out.
3.1 Start‑up Plan
3.1.1 Estimates
·
Specify the estimated cost,
schedule and resource requirements for conducting the project, and specify the
associated confidence levels for each estimate.
·
Specify the methods, tools and
techniques used to estimate project cost, schedule and resource requirements;
·
Specify the sources of estimate
data and the basis of the estimation such as: analogy, rule of thumb, standard
unit of size, cost model, historical database, etc.
·
Specify the methods, tools,
techniques to be used to re‑estimate the project cost, schedule and required
resources.
·
Specify the schedule for re‑estimation,
which might be regular, a periodic or event‑driven (e.g.: on project
milestones).
3.1.2 Staffing
·
Specify the number of required
staff, providing the following details:
−
number of personnel by skill
level,
−
numbers and skill levels in
each project phase, and
−
duration of personnel
requirement.
·
Specify the sources of staff
personnel (e.g.: internal transfer, new hire, contracted, etc.)
·
Consider using resource Gantt
charts, resource histograms, spreadsheets and tables to depict the staffing
plan by skill level, by project phase, and by aggregations of skill levels and
project phases.
3.1.3 Resource Acquisition
·
Specify the plan for acquiring
the resources and assets, in addition to personnel, needed to successfully
complete the project.
·
Describe the resource
acquisition process.
·
Specify the assignment of responsibility
for all aspects of resource acquisition.
·
Specify acquisition plans for
equipment, computer hardware and software, training, service contracts,
transportation, facilities, and administrative and janitorial services.
·
Specify when in the project
schedule the various acquisition activities will be required.
·
Specify any constraints on
acquiring the necessary resources.
·
If necessary, expand this
subsection to lower levels, to accommodate acquisition plans for various types
of resources.
3.1.4 Project Staff Training
·
Specify the training needed to
ensure that necessary skill levels in sufficient numbers are available to
successfully conduct the IM/IT project.
·
Specify the following training
information:
−
the types of training to be
provided,
−
numbers of personnel to be
trained,
−
entry and exit criteria for
training, and
−
the training method, for
example: lectures, consultations, mentoring, computer‑assisted training, etc.
·
Identify training as needed in
technical, managerial and supporting activity skills.
3.2 Work Plan
3.2.1 Work Breakdown Structure
·
Define a Work Breakdown
Structure (WBS) to specify the various work activities to be performed in the
IM/IT project, and to depict the relationships among these work activities.
·
Decompose the work activities
to a level that exposes all project risk factors, and that allows accurate
estimation of resource requirements and schedule duration for each work
activity.
·
Specify the following factors
for each work activity:
−
necessary resources,
−
estimated duration,
−
products or deliverables of the
activity,
−
acceptance criteria for the
work activity products, and
−
predecessor and successor work
activities.
·
The level of decomposition
internally within the WBS may vary depending on the quality of the
requirements, familiarity of the work, applicable level of technology, etc.
3.2.2 Schedule Allocation
·
Specify the scheduling
relationships among the project work activities in a manner that depicts the
time‑sequencing constraints and illustrates opportunities for concurrent work
activities.
·
Identify the critical path in
the schedule.
·
Indicate any constraints on the
scheduling of particular work activities, that are caused by external factors.
·
Identify appropriate schedule
milestones to assess the scope and quality of project work products and of
project achievement status.
·
Techniques for depicting
schedule relationships may include milestone charts, activity lists, activity
Gantt charts, activity networks, critical path networks and PERT charts.
3.2.3 Resource Allocation
·
Provide a detailed itemization
of the resources allocated to each major work activity in the project WBS.
·
Specify the numbers and
required skill levels of personnel for each work activity.
·
Specify, as appropriate, the
allocation of the following resources:
−
personnel (by skill level),
−
computing resources
−
software tools
−
special testing and simulation
facilities, and
−
administrative support.
·
Use a separate line item for
each type of resource for each work activity.
3.2.4 Budget Allocation
·
Provide a detailed breakdown of
the necessary resource budgets for each of the major work activities in the
WBS.
·
Specify the estimated cost for
activity personnel, and include as appropriate, the costs for the following
items:
−
travel,
−
meetings,
−
computing resources,
−
software tools,
−
special testing and simulation
facilities, and
−
administrative support.
·
Use a separate line item for
each type of resource in each activity budget.
3.3 Project Tracking Plan
3.3.1 Requirements Management
·
Specify the process for
measuring, reporting and controlling changes to the project requirements.
·
Specify the processes to be
used in assessing the impact of requirements changes on product scope and
quality, and the impacts of requirements changes on project schedule, budget,
resources and risk factors.
·
In the configuration management
processes, specify change control procedures and the formation and use of a
change control board.
·
In the processes for
requirements management, include traceability, prototyping and modeling, impact
analysis and reviews.
3.3.2 Schedule Control
·
Specify the schedule control
activities by identifying the processes to be used for the following purposes:
−
to measure the progress of work
completed at the major and minor project milestones,
−
to compare actual progress to
planned progress, and
−
to implement corrective action
when actual progress does not conform to planned progress.
·
Specify the methods and tools
that will be used to measure and control schedule progress.
·
Identify the objective criteria
that will be used to measure the scope and quality of work completed at each
milestone, and hence to assess the achievement of each schedule milestone.
3.3.3 Budget Control
·
Specify the budget control
activities by identifying the processes to be used for the following purposes:
−
to measure the cost of work
completed,
−
to compare the actual cost to
the planned and budgeted costs, and
−
to implement corrective action
when the actual cost does not conform to the budgeted cost.
·
Specify when cost reporting
will be done in the project schedule.
·
Specify the methods and tools
that will be used to track the project cost.
·
Identify the schedule
milestones and objective indicators that will be used to assess the scope and
quality of the work completed at those milestones.
·
Specify the use of a mechanism
such as earned value tracking to report the budget and schedule plan, schedule
progress, and the cost of work completed.
3.3.4 Quality Control
·
Specify the processes to be
used to measure and control the quality of the work and the resulting work
products.
·
Specify the use of quality
control processes such as quality assurance of conformance to work processes,
verification and validation, joint reviews, audits and process assessment.
3.3.5 Reporting
·
Specify the reporting
mechanisms, report formats and information flows to be used in communicating
the status of requirements, schedule, budget, quality, and other desired or
required status metrics within the project and to entities external to the
project.
·
Specify the methods, tools and
techniques of communication.
·
Specify a frequency and detail
of communications related to project management and metrics measurement that is
consistent with the project scope, criticality, risk and visibility.
3.3.6 Project Metrics
·
Specify the methods, tools, and
techniques to be used in collecting and retaining project metrics.
·
Specify the following metrics
process information:
−
identification of the metrics
to be collected,
−
frequency of collection, and
−
processes for validating,
analyzing, and reporting the metrics.
3.4 Risk Management Plan
·
Specify the risk management
plan for identifying, analyzing, and prioritizing project risk factors.
·
Specify plans for assessing
initial risk factors and for the ongoing identification, assessment, and
mitigation of risk factors throughout the life cycle of the project.
·
Describe the following:
−
procedures for contingency
planning,
−
procedures for tracking the
various risk factors,
−
procedures for evaluating
changes in the levels of the risk factors and responding to changes in the
levels of the risk factors,
−
risk management work
activities,
−
procedures and schedules for
performing risk management work activities,
−
risk documentation and
reporting requirements,
−
organizations and personnel
responsible for performing specific risk management activities, and
−
procedures for communicating
risks and risk status among the various customer, project and subcontractor
organizations.
·
Identify and describe the
applicable impact of any of the following risk factors:
−
risks in the customer‑project
relationship,
−
contractual risks,
−
technological risks,
−
risks caused by the size and
complexity of the product,
−
risks in the development and
target environments,
−
risks in personnel acquisition,
skill levels and retention
−
risks to schedule and budget,
and
−
risks in achieving customer
acceptance of the deliverables.
3.5 Project Closeout Plan
·
Identify the plans necessary to
ensure orderly closeout of the IM/IT project.
·
Specify the following:
−
a staff reassignment plan
−
a process for archiving project
materials,
−
a process for capturing project
metrics in the business projects database,
−
a process for post‑mortem
debriefings of project personnel, and
−
a plan for preparation of a
final report to include lessons learned and an analysis of project objectives
achieved.
4.
Technical
Process Plans
4.1 Process Model
·
Define the relationships among
major project work activities and supporting processes.
·
Describe the flow of
information and work products among activities and functions.
·
Specify the timing of work
products to be generated.
·
Identify the reviews to be
conducted.
·
Specify the major milestones to
be achieved.
·
Define the baselines to be
established.
·
Identify the project
deliverable to be completed.
·
Specify the required approvals
within the duration of the project.
·
In the process model for the
project, include project initiation and project termination activities.
·
Use a combination of graphical
and textual notations to describe the project process model.
·
Indicate any tailoring of your
organization's standard process model for a project.
4.2 Methods, Tools, and Techniques
·
Specify
the development methodologies, programming languages and other notations, and
the processes, tools and techniques to be used to specify, design, build, test,
integrate, document, deliver, modify and maintain the project deliverable and
non‑deliverable work products.
·
Specify
the technical standards, policies, and procedures governing development and/or
modification of the work products.
4.3 Infrastructure
·
Specify the plan for
establishing and maintaining the development environment (hardware, operating
system, network and software), and the policies, procedures, standards, and
facilities required to conduct the IM/IT project. These resources may include
workstations, local area networks, software tools for analysis, design
implementations, testing, and project management, desks, office space, and
provisions for physical security, administrative personnel, and janitorial
services.
4.4 Product Acceptance
·
Specify the plan for customer
acceptance of the deliverables generated by the IM/IT project.
·
Specify objective criteria for
determining acceptability of the deliverables.
·
Reference a formal agreement of
the acceptance criteria signed by representatives of theIM/ITorganization and
the customer.
·
Specify any technical
processes, methods, or tools required for deliverable acceptance, such as
testing, demonstration, analysis and inspection.
5.
Supporting
Process Plans
5.1 Configuration Management
·
Specify or reference the
configuration management plan for the IM/IT project, providing the information
identified in the following lines.
·
Specify the methods that will
be used to perform the following activities:
−
configuration identification,
−
configuration control,
−
status accounting,
−
evaluation, and
−
release management.
·
Specify the processes of
configuration management including procedures for the following activities:
−
initial baselining of work
products,
−
logging and analysis of change
requests,
−
change control board
procedures,
−
tracking of changes in
progress, and
−
procedures for notification of
concerned parties when baselines are established or changed.
·
Identify the automated
configuration management tools used to support the configuration management
process.
5.2 Verification and Validation
·
Specify or reference the
verification and validation plan for the IM/IT project, providing the
information identified in the following lines.
·
Specify the scope, tools,
techniques and responsibilities for the verification and validation work
activities.
·
Specify the organizational
relationships and degrees of independence between development activities and
verification and validation activities.
·
Specify the use of verification
techniques such as traceability, milestone reviews, progress reviews, peer
reviews, prototyping, simulation and modeling.
·
Specify the use of validation
techniques such as testing, demonstration, analysis and inspection.
·
Identify the automated tools to
be used in verification and validation.
5.3 Documentation
·
Specify the plans for
generating non‑deliverable and deliverable project documentation.
·
Specify the organizational
entities responsible for providing input information, and for generating and
reviewing the project documentation.
·
Specify the following
information or object identification:
−
list of documents to be
prepared,
−
controlling template or
standard for each document,
−
who will prepare each document,
−
who will review each document,
−
due dates for review copies,
−
due dates for initial baseline
versions, and
−
a distribution list for review
copies and baseline versions and quantities required
5.4 Quality Assurance
·
Specify or reference the
quality assurance plan for the IM/IT project, containing the information
identified in the following lines.
·
Specify the plans for assuring
that the IM/IT project fulfills its commitments to the IM/IT process and the
IM/IT product as specified in the requirements specification, the IM/IT Project
Management Plan, supporting plans and any standards, procedures, or guidelines
to which the process or the product must adhere.
·
As applicable, specify the
quality assurance procedures to be used, such as analysis, inspection, review,
audit, and assessment.
·
Indicate the relationship among
the quality assurance, verification and validation, review, audit,
configuration management, system engineering, and assessment processes.
5.5 Reviews and Audits
·
Specify the schedule,
resources, and processes, and procedures to be used in conducting project
reviews and audits.
·
Specify the plans for joint
customer‑project reviews, management progress reviews, developer peer reviews,
quality assurance audits, and customer‑conducted reviews and audits.
·
List the external agencies that
approve or regulate any project deliverable.
5.6 Problem Resolution
·
Specify the resources, methods,
tools, techniques and procedures to be used in reporting, analyzing,
prioritizing and processing IM/IT problem reports generated during the project.
·
Indicate the roles of
development, configuration management, the change control board, and
verification and validation in problem resolution work activities.
·
Provide for separate tracking
of effort expended on problem reporting, analysis and resolution, so that
rework can be tracked and process improvement accomplished.
5.7 Subcontractor Management
·
Specify or reference the plans
for selecting and managing any subcontractors that may participate in or
contribute to the IM/IT project.
·
Specify the criteria for
selecting subcontractors.
·
Generate a separate management
plan for each subcontract, using a tailored version of this Project Plan, and
include all items necessary to ensure successful completion of each subcontract
as follows:
−
requirements management,
−
monitoring of technical
progress,
−
schedule and budget control
−
product acceptance criteria,
−
risk management procedures,
−
additional topics as needed to
ensure successful completion of the subcontract, and
−
a reference to the official
subcontract and subcontractor/prime contractor points of contact.
5.8 Process Improvement
·
Specify the plans for
periodically assessing the project, for determining areas for improvement, and
for implementing the improvement plans.
·
Ensure that the process
improvement plan is closely related to the problem resolution plan.
·
Include in the improvement
plan, a process to identify the project processes that can be improved without
serious disruption to an ongoing project, and to identify the project processes
that can best be improved by process improvement initiatives at the
organizational level.
6.
Additional
Plans
·
Specify or reference any
additional plans required to satisfy product requirements and contractual
terms, which may include:
−
plans for assuring that safety,
privacy, and security requirements are met,
−
special facilities or equipment
specification,
−
product installation plans,
−
user training plans,
−
integration plans,
−
data conversion plans,
−
system transition plans,
−
product maintenance plans, or
−
product support plans.
7.
Project
Evolution
7.1 Project support and maintenance
·
Specify or reference to the
support, maintenance and operational model for the project when the project
will be used by the potential customers
7.2 Follow-up projects
·
Identify potential follow-up
projects which will use this project
·
Identify potential follow-up
projects which will supersede this project